Here are some of our spare parts:
29540165 |
DUST COVER |
|
|
55059327 |
CYLINDER |
96.3531 |
|
55042729 |
CYLINDER |
16 |
|
55057685 |
CYLINDER |
8.3169 |
|
55058668 |
CYLINDER |
7.5053 |
|
BR00076845 |
STEERING CYLINDER |
25.0018 |
|
BR00079339 |
SCREEN |
|
|
BR00079338 |
GASKET |
0.01 |
|
BG01303250 |
SCREEN |
0.02 |
|
BR00052443 |
WORK LIGHT, LED |
1.46 |
|
BR00074934 |
PUMP,ELETRIC DRIVEN CHARGING PUMP |
4.91 |
|
55018544 |
ROCKER SWITCH |
0.01 |
|
3222989738 |
GLASS |
|
|
3222989584 |
GLASS |
|
|
55180123 |
SEAL KIT |
0.37 |
|
BG00397111 |
SEAL KIT |
0.3 |
|
55064566 |
ROD SEAL |
0.001 |
|
55078945 |
REAR CYLINDER RD314 |
1.42 |
|
55186990 |
FRONT CYLINDER |
2.03 |
|
55078646 |
DISTRIBUTOR |
0.15 |
|
55078979 |
BUSHING |
2 |
|
BG00664624 |
PARIETAL PLATE |
0 |
|
87218119 |
RELAY |
0.025 |
|
55000927 |
PROPEL CYLINDER |
|
|
009679-002 |
MANIFOLD, COMP COOL |
11.5668 |
|
016394-001 |
VALVE, CHECK |
0.454 |
|
009679-052 |
CARTRIDGE KIT, SEAL |
0.03 |
|
4350265089 |
LOCK NUT |
1.6 |
|
4350265102 |
CLAMPING SLEEVE |
2.8 |
|
56045775 |
FILTER, RETURN |
17 |
|
56027063 |
INDICATOR |
0.14 |
|
55180870 |
SEAL KIT |
0.42 |
|
5726808234 |
CYLINDER |
1.4 |
|
3217997019 |
ELECTRIC MACHINERY |
310 |
|
09373674 |
SEAL |
0 |
|
55162804 |
SUPPORT RING |
|
|
55153450 |
PISTON DIRT RING |
0.06 |
|
55097184 |
O-RING |
0.006 |
|
56028949 |
SEAL |
0.001 |
|
55165042 |
SEAL |
0.039 |
|
55020926 |
SEAL |
0.1 |
|
55155321 |
PISTON GUIDE RING |
0.05 |
|
55153451 |
PISTON DIRT RING |
0.1 |
|
55155990 |
O-RING |
0.02 |
|
55153345 |
ROD SEAL |
0.06 |
|
55153350 |
SUPPORT RING |
|
|
55153459 |
ROD DIRT RING |
1 |
|
55153342 |
WIPER |
0.1 |
|
55155385 |
SEAL |
0.06 |
|
86970019 |
U-SEAL |
0.015 |
|
88461549 |
PISTON ROD GUIDERING |
0.015 |
|
55165277 |
SEAL KIT |
0.5 |
|
55100070 |
PLATE |
3.6 |
|
80315239 |
HOSE |
0.219 |
|
69041385 |
FILTER ELEMENT 6942849 |
|
|
69040405 |
FILTER ELEMENT 6157642 |
|
|
61507642 |
FUEL FILTER ELEMENT, DIESEL ENGINE |
0.2 |
|
64648737 |
FILTER ELEMENT |
|
|
77012153 |
STRAINER (FILTER ELEMENT FOR WATER |
0.001 |
|
73833203 |
FILTER |
7.44 |
|
56017457 |
SIDE GEAR |
2.4 |
|
04699374 |
FILTER |
0 |
|
51401430 |
NUT |
|
|
51441030 |
LOCK WASHER |
|
|
17436748 |
11144249 CUSHION |
|
|
3222320792 |
LOCK SHEET |
0.3 |
|
6060100226 |
IDLER |
|
|
9110999684 |
SEAL KIT |
0.005 |
|
1261100013 |
SEAL KIT |
0.005 |
|
9110953722 |
MAIN CONTROL VALVE SEAL KIT |
0.005 |
Sealing element |
3222316451 |
MAIN AIR VALVE REPAIR KIT |
0.001 |
|
9110999690 |
SEAL KIT |
0.005 |
Sealing element |
9110999688 |
SEAL SET |
0.001 |
Sealing element |
9106131900 |
SEAL KIT |
0.005 |
Sealing element |
BG00395793 |
SEAL KIT |
0.145 |
rock drill |
81664759 |
HEX.SOCKETRB |
0.024 |
|
5750531784 |
PLAIN BEARING |
0.065 |
|
9900459403 |
FLOW CONTROL VALVE 321799553 |
0.41 |
|
55095272 |
GUIDE RING |
|
|
55095413 |
SHAFT SEAL |
|
|
55151880 |
WIPER |
0.003 |
|
55153444 |
GUIDE STRIP |
|
|
55150618 |
O-RING |
0.001 |
|
3128314785 |
PROPULSION ASSEMBLY |
11.1 |
|
5112012039 |
BELT |
|
|
55048543 |
DRIVE WHEEL |
40 |
|
34449504 |
BEAM ASSEMBLY TF5-16' |
300 |
|
06481576 |
PROPULSION BEAM |
|
|
55153743 |
WORKING LIGHT |
1.16 |
|
69041466 |
FILTER ELEMENT 5551165 |
|
|
56026885 |
GEARBOX *SEE T-TEXT* |
380.5 |
|
HD712-01012 |
SET |
|
|
5580012552 |
WATER PUMP |
0 |
|
55150568 |
SEAL KIT |
0.16 |
|
55155989 |
SEAL KIT |
0.49 |
|
55152126 |
SEAL KIT |
0.1 |
|
55155841 |
SEAL KIT |
0.04 |
|
85577708 |
REPAIR KIT |
|
|
55033478 |
SEAL KIT |
0.16 |
|
3222327724 |
DRIVE UNIT |
126 |
|
About us:
Established in 2011, JUNTAI is a company dedicated to making and selling after-market spare parts for Sandvik and Epiroc mining engineering machineries. Its parent company, Jinjiang Wantai, was established in 1989, with a plant area of 10,000
㎡, and its products have passed the ISO9001:2015 quality system certification. Yunnan Wantai, a subsidiary of the parent company, is one of the largest companies selling drilling rigs in southwest China.
Our Clients:
Power Construction Corporation of China, China Energy Engineering Corporation Ltd. China Railway Construction Corporation Ltd. Jinchuan Group Co., Ltd. Pangang Group Company Ltd. China Railway Tunnel Bureau Group Co., Ltd. China Wuyi Co., Ltd. CGC Overseas Construction Group Co., Ltd. Yunnan Phosphate Chemical Group Co., Ltd. Yunnan Tin Group Co., Ltd. Yunnan Copper Industry (Group) Co., Ltd. Yuxi Yukun Iron and Steel Co., Ltd. Yunnan Hualian Zinc& Indium Stock Co., Ltd. China Anneng Construction Group Co., Ltd.
Why Choose JunTai Machinery:
1.Industrial Experience
With 30 years of experience in making and selling construction machinery, the company has built a great client base and excellent reputation throughout China, and sold products to many foreign countries and regions.
2.Quality Assurance
All of our products are subject to strict testing and real machine inspection to ensure that all sold products could work as along as the service lives warrantied by original manufacturers.
3.Fast Delivery
We have large-scaled spare part warehouses in Fujian and Yunnan with comprehensive stocks to ensure timely delivery.
FAQS:
What are the main products of your company?
Spare parts for Epiroc and Sandvik machine, spare parts for drilling rigs, drilling jumbo, scrapers, the kinds of spare parts include JUNTAI (self-produced products), substitution (made in China or import from abroad), OEM (original equipment manufacturer).
What to offer for inquiry
?
Please provide part number and actual demand quantity for inquiry. If the description is different with the part number, the part number prevails.
How long does our price valid?
Price lists are only valid for 30 days, follow the principle of priority sales.
Does this price include the duty
?
All prices are exclusive of 13% VAT and other taxes or official duties.
What about the terms of payment
?
30% advance payment, full payment before delivery.
What about the typically delivery time?
We have spare part stocks in our warehouses, which can be shipped on each working day. In case no ready products available at warehouses, we can prepare for delivery after receiving 30% deposit. After receiving the prepared products at warehouse, the shipment could be arranged on the closest business day immediately. The delivery may be ahead of schedule or delayed due to inventories of raw materials or the number of orders.